A production-linked incentive (PLI) is a cash payment from the government to a manufacturer, calculated as a percentage of the extra sales it makes in India compared with a fixed base year, paid for a fixed number of years, and paid only in years when the company has also crossed pre-set investment and sales thresholds. That sentence is the whole design. India announced PLI schemes for 14 sectors with a combined outlay of ₹1.97 lakh crore (about US$24 billion) in the 2021-22 Budget; the first, for mobile phones, ran from 2020 and closed on 31 March 2026. This guide explains the mechanism, works through a claim, reads the scorecard and sets out what comes next.
How a PLI differs from a subsidy or a tax holiday
A capital subsidy pays a share of what a company spends on a plant. A tax holiday forgives tax on profits whether or not output grows. A PLI pays only on output that is sold, and only on the increase. DPIIT calls this the shift “from traditional input-based incentives to outcome-linked support, wherein incentives are directly tied to incremental sales of goods manufactured in India over a defined base year” (PIB, 20 February 2026).
Three features follow:
- The base year is frozen. For the mobile scheme it is FY2019-20. A company already large in India earns nothing for standing still.
- Thresholds gate each year separately. Miss that year’s minimum cumulative investment or incremental sales and that year’s incentive is lost, though the company can claim again the next year.
- The money comes after the fact. Claims are filed on audited numbers after the year closes, verified, then paid from a budget line. That is why “investment realised” always runs years ahead of “incentive disbursed”.
The outlay is ordinary budget expenditure; our guide to how the Union Budget is made shows where a line like this sits.
The 14 sectors and the money
The programme came in three steps: three schemes in March 2020 (mobile phones and components, bulk drugs, medical devices), ten more approved by Cabinet on 11 November 2020, and drones in September 2021. Each ministry then wrote its own scheme, with its own rates, thresholds and tenure, within the ceilings below (PIB, 11 November 2020).
| Sector | Implementing ministry or department | Approved outlay (₹ crore) |
|---|---|---|
| Mobile manufacturing and specified electronic components | MeitY | 40,951 |
| Automobiles and auto components | Heavy Industries | 57,042, later revised to 25,938 |
| Advance chemistry cell (ACC) batteries | Heavy Industries, with NITI Aayog | 18,100 |
| Pharmaceutical drugs | Pharmaceuticals | 15,000 |
| Telecom and networking products | Telecommunications | 12,195 |
| Food products | Food Processing Industries | 10,900 |
| Textiles (man-made fibre and technical textiles) | Textiles | 10,683 |
| Critical bulk drugs (KSMs, intermediates, APIs) | Pharmaceuticals | 6,940 |
| Specialty steel | Steel | 6,322 |
| White goods (air conditioners and LED lights) | DPIIT | 6,238 |
| Electronic/technology products (IT hardware) | MeitY | 5,000, replaced by a ₹17,000 crore PLI 2.0 in May 2023 |
| High-efficiency solar PV modules | New and Renewable Energy | 4,500, plus a ₹19,500 crore second tranche |
| Medical devices | Pharmaceuticals | 3,420 |
| Drones and drone components | Civil Aviation | 120 |
The automobile revision and solar tranche are from PIB’s November 2024 backgrounder; IT hardware 2.0 from the May 2023 Cabinet release; drones from the Ministry of Civil Aviation. Two totals are in official use: ₹1.97 lakh crore, announced in the 2021-22 Budget and still used in PIB backgrounders in February 2026, and ₹1.91 lakh crore, the “approved financial outlay” in DPIIT’s 2026 parliamentary replies after revisions to individual schemes (PIB, 21 July 2026).
The mobile-phone scheme as the template
The PLI for Large Scale Electronics Manufacturing (LSEM), notified on 1 April 2020, became the model the others copied. The PIB factsheet gives the frame: 4% to 6% on incremental sales over the base year, for five years from 1 August 2020, later stretched to six (to FY2025-26) so pandemic-delayed companies could shift their window.
The guidelines, summarised by the industry body ELCINA in a slide deck, fill in the numbers for the main segment, phones with an invoice value of ₹15,000 and above:
- Who could apply: companies with more than ₹10,000 crore of global manufacturing revenue in the segment in the base year, capped at five applicants. Indian-owned companies had a parallel segment needing ₹100 crore; component makers needed ₹50 crore.
- Rate by year: 6%, 6%, 5%, 5%, 4%.
- Investment threshold (cumulative from 1 April 2020): ₹250 crore by year one, rising to ₹1,000 crore by year four. Plant, machinery, R&D and technology transfer count; land and buildings do not.
- Incremental sales threshold: ₹4,000 crore in year one, then ₹8,000 crore, ₹15,000 crore, ₹20,000 crore and ₹25,000 crore.
- Ceiling: the segment’s annual outlay is shared among eligible applicants; with five, each can earn at most a fifth, and what an underperformer leaves unclaimed is redistributed at year end.
The guidelines also define domestic value addition (net sales minus imported materials and services, divided by net sales) and require a five-year plan for raising it.
The approval and payment flow
The chain is the same in every sector with different names in the boxes. DPIIT is the nodal department for the programme; each ministry owns its scheme; a Project Management Agency (PMA), for LSEM the Industrial Finance Corporation of India (IFCI), does the paperwork (PIB, 21 July 2026).
- Application window. A portal opens for a fixed period (four months for LSEM in 2020). One application per company, a ₹1 lakh fee, and a filing with forecast revenue, proposed investment and plans for value addition and jobs.
- Appraisal and approval. The PMA appraises and recommends to an Empowered Committee of secretaries (for LSEM, chaired by the CEO of NITI Aayog). The competent authority under Finance Ministry delegation approves; the PMA issues a letter stating the company’s yearly thresholds and ceiling.
- Baseline fixing. From audited documents, the PMA fixes base-year sales and investment as on 31 March 2020. Every future claim is measured against this.
- Annual claim. After each financial year the company files a claim with statutory-auditor certificates. The PMA verifies thresholds and computes the incentive; the committee approves; disputes go to the ministry, whose decision is final.
- Payment. The PMA pays once formalities are complete and “after funds are made available”, in the guidelines’ words. Food-processing’s ministry told Parliament that claims fall due in December and are paid between January and March (PIB, 22 March 2025).
A worked example (hypothetical)
Take an imagined contract manufacturer, Vistara Devices, approved in the ₹15,000-and-above segment with base-year (FY2019-20) sales of eligible phones of ₹3,000 crore. The figures are invented to show the arithmetic.
| Scheme year | Eligible sales | Incremental sales over base | Sales threshold | Cumulative investment | Investment threshold | Rate | Incentive |
|---|---|---|---|---|---|---|---|
| Year 1 (FY2020-21) | ₹8,000 crore | ₹5,000 crore | ₹4,000 crore ✓ | ₹300 crore | ₹250 crore ✓ | 6% | ₹300 crore |
| Year 2 (FY2021-22) | ₹10,000 crore | ₹7,000 crore | ₹8,000 crore ✗ | ₹550 crore | ₹500 crore ✓ | 6% | nil |
| Year 3 (FY2022-23) | ₹20,000 crore | ₹17,000 crore | ₹15,000 crore ✓ | ₹800 crore | ₹750 crore ✓ | 5% | ₹850 crore |
Three things to notice. In year two the company grew by a quarter and earned nothing, because the hurdle is set against the base year and rises annually. In year three the rate fell while the cheque grew, because incremental sales are what scale. And each cheque is capped: if the segment’s year-three outlay were ₹4,000 crore shared by five companies, the cap would be ₹800 crore and the last ₹50 crore would come back only if a rival underperformed.
Now add time. The year-three claim is filed after March 2023, audited, approved and paid from a later budget. That is the mechanical reason the mobile scheme’s disbursed total (with IT hardware) stood at ₹15,554 crore in March 2026 while its reported production had passed ₹8 lakh crore a year earlier (PIB, 27 March 2026).
What the official scorecard says
DPIIT’s latest consolidated numbers are in a Lok Sabha reply of 21 July 2026 (PIB); disbursement is from its February 2026 release (PIB).
| Measure | Latest official figure | As of |
|---|---|---|
| Applications approved | 836 across 14 sectors | 31 December 2025 |
| Investment realised | over ₹2.40 lakh crore | 31 March 2026 |
| Cumulative production or sales | over ₹20.41 lakh crore | 31 December 2025 |
| Cumulative exports | ₹15.2 lakh crore (₹4.0 lakh crore at March 2024, ₹6.5 lakh crore at March 2025) | 31 March 2026 |
| Employment | 14.15 lakh: 8.49 lakh direct, 5.66 lakh indirect (indirect reported by three sectors only) | 31 March 2026 |
| Incentive disbursed | ₹28,748 crore | 31 December 2025 |
Three cautions. The export line more than doubled in a year and the reply does not say whether the measurement basis changed (the February 2026 release had ₹8.3 lakh crore to December 2025). “Production” is gross sales reported by beneficiaries, not value added in India. And disbursement is about 15% of the approved outlay after five years.
Investment is lopsided: solar PV ₹64,873 crore, pharmaceuticals ₹45,158 crore, automobiles ₹44,326 crore, mobile phones ₹20,580 crore, and ACC batteries ₹4,570 crore against an ₹18,100 crore outlay. Food processing reported the most jobs (3.29 lakh) on ₹9,207 crore; solar reported 14,794 on seven times that money.
The flagship: what the mobile scheme delivered
The 2021 factsheet projected, over five years, production of over ₹10.5 lakh crore, exports of about ₹6.5 lakh crore, investment of around ₹11,000 crore and over 2 lakh direct jobs.
MeitY told the Lok Sabha in July 2025 that beneficiaries had reported investment of ₹12,390 crore, production of ₹8,44,752 crore, exports of ₹4,65,809 crore and 1,30,330 direct jobs to June 2025 (PIB, 23 July 2025); by March 2026, investment was ₹20,580 crore and direct jobs 1,69,249 (July 2026 annexure). At the Cabinet briefing on the successor scheme, the electronics minister put the closed scheme’s production at over ₹11.6 lakh crore and exports at over ₹6.4 lakh crore, with about ₹19,090 crore disbursed (Outlook Business). Production and investment beat target; exports landed on it; direct jobs came in under.
The sector-level change is not in dispute. Mobile-phone production rose from about ₹18,000 crore in FY2014-15 to ₹5.45 lakh crore in FY2024-25, exports from ₹1,500 crore to ₹2 lakh crore, and 99.2% of phones used in India are now made here (PIB, July 2025 and July 2026). Smartphones became India’s largest export product in 2025 (PM India, 15 July 2026), and Apple’s Tim Cook told analysts on 1 May 2025 that he expected “the majority of iPhones sold in the US” that quarter to have India as their country of origin (Business Today).
What it did not do, by the government’s own account, is move value addition far: MeitY cites industry estimates of 18–20% in electronics (PIB, July 2025), against the 35–40% the factsheet hoped for. That gap is what the successor schemes target.
The criticisms, as reported
The sharpest outside account is Reuters’ investigation of March 2025, republished by Autocar Professional: of roughly 750 firms that signed up, many had not started production; those that met targets found payment slow; US$1.73 billion had been disbursed, under 8% of the allocation; and participants had produced 37% of the targeted output by October 2024. Officials told Reuters the government would neither expand PLI beyond 14 sectors nor extend production deadlines, and had refused to extend the solar scheme beyond 2027 because that would reward non-performers. A month earlier the Financial Express, via The Wire, quoted an official saying “PLI is no longer the favoured child”, with ₹11,317 crore, or 6% of the outlay, disbursed to September 2024.
The government’s reply, in its March 2025 Lok Sabha answer, is the timing argument: projects take two to three years to build and claims follow the first year of production. The same answer concedes sector-level trouble: specialty steel had released ₹48 crore of incentive, 14 of 58 projects had withdrawn, and the ministry expected to pay only ₹2,000 crore of its ₹6,322 crore outlay by the end (PIB, 22 March 2025).
The structural critique is simpler. A scheme that pays on sales rewards whoever can assemble at scale fastest, which in electronics meant large contract manufacturers importing most of the bill of materials. Manufacturing’s share of GDP did not rise over the period, as Reuters noted; our guide to reading India’s GDP numbers explains how that share is measured. And a ₹10,000 crore global-revenue bar excludes small firms by construction.
What is replacing it
The decision not to write new PLIs held. What came instead are schemes with different levers, mostly in electronics.
- Electronics Component Manufacturing Scheme (ECMS). Notified on 8 April 2025 with ₹22,919 crore over six years plus a one-year gestation period, it targets the layer below assembly: display and camera modules, circuit boards, passive components, enclosures and the machines that make them. Sub-assemblies and components get turnover-linked incentives, the capital goods feeding them get capex incentives, and part of every payout is tied to employment targets (PIB, 28 March 2025). The Budget 2026-27 speech raised the outlay to ₹40,000 crore because commitments were already double the target (Budget speech, 1 February 2026); by 17 August 2026, 106 applications were approved with about ₹69,000 crore committed (News On AIR). Where chips sit in that stack is the subject of our explainer on fabs, OSATs and chip design.
- Mobile Phone Manufacturing Scheme (MPMS). Approved on 15 July 2026 with ₹62,500 crore for FY2026-27 to FY2030-31, it keeps the sales-linked core at lower rates, 2.25% to 5%, and adds up to 1.5% for domestic sourcing of key components and 3% for Indian brands’ design and R&D; the target is ₹39 lakh crore of production and about 60,000 direct jobs (PM India).
- Other designs. The 2026-27 Budget announced a ₹10,000 crore container-manufacturing scheme and a second semiconductor mission; the Financial Express reported that planned schemes for toys, leather and footwear would focus on jobs and quality. The ₹99,446 crore Employment Linked Incentive scheme, which pays on hiring rather than sales, is the other half of the shift (PIB, 27 March 2026).
What it means for a small supplier
You were mostly not the applicant. Of 764 approved applications in March 2025, 176 were MSMEs, concentrated in sectors with low entry bars such as drones, where a component maker needed ₹50 lakh of annual sales (PIB, 22 March 2025; Civil Aviation, 9 December 2021). The electronics schemes were written for anchors, though ECMS’s capex incentive explicitly covers “parts/components used in manufacturing of sub-assembly and bare components”, which is tier-two territory. MSME status matters for some of this; see what Udyam registration gets you.
The incentive reaches the anchor, but the anchor’s rules reach you. A beneficiary is measured on domestic value addition and, under MPMS, paid extra for local sourcing. A part made in India raises the customer’s ratio and, from FY2026-27, its rate. That is your sales argument, and why anchors now ask suppliers for origin paperwork.
Price in the timing. The anchor’s cheque arrives a year or more after the sales it rewards, and only if that year’s thresholds were met. Treat PLI as a reason the customer exists, not as its working capital.
Common misunderstandings
- “PLI pays a percentage of investment.” It pays a percentage of incremental sales. Investment is a gate, not the base.
- “Low disbursement means the money was not spent on factories.” Investment realised (₹2.40 lakh crore) is the companies’ money; incentive paid (₹28,748 crore) is the government’s, and it lags by design.
- “PLI was extended.” The mobile scheme ended on 31 March 2026 as scheduled. What followed is a new scheme with a new name, lower headline rates and new conditions.
The point: A production-linked incentive is a bet paid on results: a few percent of the extra sales a factory makes in India over a frozen base year, released only in years it also clears investment and sales hurdles, and only after audit. That design explains both what the headlines celebrate (mobile production up 28-fold in a decade, smartphones India’s top export) and what they criticise (about 15% of the outlay paid after five years, several sectors far behind). The government has stopped writing new PLIs and is now paying for the layer underneath, components, sourcing and jobs, through ECMS and the mobile scheme’s successor.
Sources
- PLI Schemes Attract Over ₹2.40 Lakh Crore Investment, Generate More Than 14.15 Lakh Jobs, Ministry of Commerce and Industry, Lok Sabha written reply, PIB, 21 July 2026 (sector-wise annexure to 31 March 2026)
- Production Linked Incentive Scheme with ₹1.91 Lakh Crore Outlay Drives Strong Industry Participation Across 14 Strategic Sectors, DPIIT, PIB, 20 February 2026 (disbursement to 31 December 2025)
- PLI Schemes attract over ₹2.16 lakh crore investment, drive ₹20.41 lakh crore production and generate 14.39 lakh jobs, Rajya Sabha reply, PIB, 27 March 2026; PLI Scheme disburses ₹15,554 crore in electronics and ₹2,377.56 crore in automobile sector incentives, PIB, 27 March 2026
- PLI scheme incentivizes domestic manufacturing, increases production, creates new jobs and boosts exports, Lok Sabha reply, PIB, 22 March 2025 (MSME count, specialty steel and food-processing withdrawals, claim timing)
- Cabinet approves PLI Scheme in 10 key sectors, PIB, 11 November 2020 (sector outlay table); Cabinet approves Production Linked Incentive Scheme for Large Scale Electronics Manufacturing, PM India, 21 March 2020
- Production Linked Incentive (PLI) Scheme for Large Scale Mobile and Component Manufacturing, PIB factsheet, 17 November 2021
- PLI Scheme for Large Scale Electronics Manufacturing: guidelines summary, ELCINA (rates, thresholds, PMA, claim process)
- Mobile Manufacturing Sees Unprecedented Growth Under PLI, MeitY, Lok Sabha reply, PIB, 23 July 2025
- PLI Schemes: Shaping India’s Industrial Growth, PIB backgrounder, 18 November 2024; Scaling New Heights: How the PLI Scheme is Reshaping Industries, PIB backgrounder, 21 December 2024
- Cabinet approves Production Linked Incentive Scheme 2.0 for IT Hardware, PIB, 17 May 2023; Government approves PLI Scheme for Drones and Drone Components, PIB, 15 September 2021; Incentive of Rs 120 crore for drone and drone component manufacturers, PIB, 9 December 2021
- Cabinet approves Electronics Component Manufacturing Scheme, PIB, 28 March 2025; Electronics Components Manufacturing Scheme: Union Budget 2026-27 raises outlay to ₹40,000 crore, PIB backgrounder, 3 February 2026
- Budget Speech 2026-27, Ministry of Finance, 1 February 2026 (paragraphs 17–21)
- 31 more applications approved by MeitY under ECMS, News On AIR, 17 August 2026
- Cabinet approves Mobile Phone Manufacturing Scheme (MPMS), PM India, 15 July 2026; Cabinet Clears ₹62,500-Cr Mobile Manufacturing Scheme, Outlook Business, 15 July 2026 (minister’s figures for the closed scheme)
- Govt Will Not Expand PLI Scheme Beyond 14 Pilot Sectors: Report, Reuters via Autocar Professional, 21 March 2025
- New PLI Schemes Shelved After Failure to Produce Satisfactory Results: Report, Financial Express via The Wire, 17 February 2025
- Most iPhones sold in the US will now be made in India, announces CEO Tim Cook, Business Today, 2 May 2025